[Back]  [Dams in Japan]  [Japanese Page]


Dam data table
 
Dam No.:1048
 
Ohtani-ike [Gifu Pref.]


Dam Photo

(Photo by: ToNo)
072566 Dam master
019119 ToNo
072581 Dam master
072590 Dam master
Location (Latitude, Longitude) N 35°211' 26'',E 136°30' 49''   [Japanese Dam Finder]
Purpose/Dam type A/E
Height/Crest length/Dam volume 18.7m/82m/86 thousand m3
Catchment area/Water surface area 1.2km2/4ha
Reservoir capacity 161 thousand m3
FY project started/completed /1914


Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation   F: Flood control   I: Water supply for industry   N: Non-specified, river flow maintenance
P: Hydropower   R: Recreation   S: Snow melting &removing   W: Water supply

2. Dam types are abbreviated as follows:
A: Arch   B: Buttress   CSG: Trapezoidal CSG   E: Earthfill   FA: Asphalt face fill   FC: Asphalt core fill   G: Gravity
GF: Gravity concrete & fill dam (compound)   HG: Hollow gravity   MA: Multi-arch   R: Rockfill

3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.

Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.

[Back]  [Dams in Japan]  [Japanese Page]