[Back]  [Dams in Japan]  [Japanese Page]


Dam data table
 
Dam No.:1130
 
Tokuyama Dam [Gifu Pref.]


Dam Photo

(Photo by: Public Relations Section, Japan Water Agency)
106453 Public Relations Section, Japan Water Agency
099242 Takashi Tsuchiya
062045 Public Relations Section, Japan Water Agency
089771 Dam master
089786 Dam master
077741 Sanchan
089809 Dam master
089713 Dam master
077834 Sanchan
089717 Dam master
099428 Ryu
065777 Sanchan
Location (Latitude, Longitude) N 35°391' 55'',E 136°30' 08''   [Japanese Dam Finder]
Purpose/Dam type FNWIP/R
Height/Crest length/Dam volume 161m/427.1m/13700 thousand m3
Catchment area/Water surface area 254.5km2/1300ha
Reservoir capacity 660000 thousand m3
FY project started/completed 1971/2007


Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation   F: Flood control   I: Water supply for industry   N: Non-specified, river flow maintenance
P: Hydropower   R: Recreation   S: Snow melting &removing   W: Water supply

2. Dam types are abbreviated as follows:
A: Arch   B: Buttress   CSG: Trapezoidal CSG   E: Earthfill   FA: Asphalt face fill   FC: Asphalt core fill   G: Gravity
GF: Gravity concrete & fill dam (compound)   HG: Hollow gravity   MA: Multi-arch   R: Rockfill

3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.

Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.

[Back]  [Dams in Japan]  [Japanese Page]