[Back]  [Dams in Japan]  [Japanese Page]


Dam data table
 
Dam No.:1224
 
Souri Dam [Aichi Pref.]


Dam Photo

(Photo by: ToNo)
019475 ToNo
058468 Dam master
058458 Dam master
019476 ToNo
Location (Latitude, Longitude) N 34°571' 48'',E 136°53' 18''   [Japanese Dam Finder]
Purpose/Dam type I/E
Height/Crest length/Dam volume 21m/180m/235 thousand m3
Catchment area/Water surface area 1195km2/62ha
Reservoir capacity 5300 thousand m3
FY project started/completed 1961/1965


Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation   F: Flood control   I: Water supply for industry   N: Non-specified, river flow maintenance
P: Hydropower   R: Recreation   S: Snow melting &removing   W: Water supply

2. Dam types are abbreviated as follows:
A: Arch   B: Buttress   CSG: Trapezoidal CSG   E: Earthfill   FA: Asphalt face fill   FC: Asphalt core fill   G: Gravity
GF: Gravity concrete & fill dam (compound)   HG: Hollow gravity   MA: Multi-arch   R: Rockfill

3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.

Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.

[Back]  [Dams in Japan]  [Japanese Page]