Dam data table @
|
Dam No.F1943 @
|
Minaga Dam mHiroshima Pref.n
|
|
|
|
Purpose^Dam type |
I^G
|
Height^Crest length^Dam volume |
18.7m^100.5m^13 thousand m3 |
Catchment area^Water surface area |
68.3km2^54ha |
Reservoir capacity |
2650 thousand m3 |
FY project started^completed |
1940^1942
|
Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation F: Flood control I: Water supply for industry N: Non-specified, river flow maintenance
P: Hydropower R: Recreation S: Snow melting &removing W: Water supply
2. Dam types are abbreviated as follows:
A: Arch B: Buttress CSG: Trapezoidal CSG E: Earthfill FA: Asphalt face fill FC: Asphalt core fill G: Gravity
GF: Gravity concrete & fill dam (compound) HG: Hollow gravity MA: Multi-arch R: Rockfill
3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.
|
Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.
|
|