[Back] @[Dams in Japan] @[Japanese Page]


Dam data table
@
Dam No.F2592
@
Korobiishi Dam mNagasaki Pref.n


Dam Photo

iPhoto by: Takashi Yasukochij
Location (Latitude, Longitude) N 33‹121' 08''CE 129‹45' 51''   [Japanese Dam Finder]
Purpose^Dam type AW^G
Height^Crest length^Dam volume 22.7m^164m^ thousand m3
Catchment area^Water surface area km2^3ha
Reservoir capacity 246 thousand m3
FY project started^completed 1923^1927


Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation   F: Flood control   I: Water supply for industry   N: Non-specified, river flow maintenance
P: Hydropower   R: Recreation   S: Snow melting &removing   W: Water supply

2. Dam types are abbreviated as follows:
A: Arch   B: Buttress   CSG: Trapezoidal CSG   E: Earthfill   FA: Asphalt face fill   FC: Asphalt core fill   G: Gravity
GF: Gravity concrete & fill dam (compound)   HG: Hollow gravity   MA: Multi-arch   R: Rockfill

3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.

Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.

[Back] @[Dams in Japan] @[Japanese Page]