[Back]  [Dams in Japan]  [Japanese Page]


Dam data table
 
Dam No.:574
 
Terayama Dam [Tochigi Pref.]


Dam Photo

(Photo by: Hi Ace)
061486 Dai
061485 Dai
047404 Dam master
026310 Hi Ace
Location (Latitude, Longitude) N 36°501' 50'',E 139°51' 52''   [Japanese Dam Finder]
Purpose/Dam type FNW/R
Height/Crest length/Dam volume 62.2m/260m/1350 thousand m3
Catchment area/Water surface area 11.5km2/16ha
Reservoir capacity 2550 thousand m3
FY project started/completed 1972/1984


Notes:
1. Dam purposes are abbreviated as follows:
A: Agricultural irrigation   F: Flood control   I: Water supply for industry   N: Non-specified, river flow maintenance
P: Hydropower   R: Recreation   S: Snow melting &removing   W: Water supply

2. Dam types are abbreviated as follows:
A: Arch   B: Buttress   CSG: Trapezoidal CSG   E: Earthfill   FA: Asphalt face fill   FC: Asphalt core fill   G: Gravity
GF: Gravity concrete & fill dam (compound)   HG: Hollow gravity   MA: Multi-arch   R: Rockfill

3. The fiscal year (FY) in Japan is from April 1 to March 31 of the following year.

Please send your comments
Copyright 2012 JAPAN DAM FOUNDATION. All rights reserved.

[Back]  [Dams in Japan]  [Japanese Page]